Metro Logistics - 6401 Foxley Road

Metro Logistics – 6401 Foxley Road

Project Summary

Type:

Industrial

Size:

140,000 SF

Location:

Upper Marlboro, MD
Awards:

2025 NAIOP DC|MD Award of Excellence for Best Industrial Flex, LEED Gold Certification


Project Team:

Penzance, Owner

MGMA, Architect



Project Overview:

Metro Logistics reimagines an 11.5-acre industrial outdoor storage site into a state-of-the-art, Class A last-mile logistics facility. The 140,000 SF tilt-up concrete building features 32’ clear heights, a 120’ truck court, flexible parking, and both interior and exterior loading designed for safe, efficient circulation. A speculative office suite was added to enhance tenant flexibility, and ready to lease.

Beyond functionality, the project sets new standards for sustainability and community impact. Designed to achieve LEED Gold Certification, the facility incorporates solar-ready infrastructure, EV charging capability, green lease provisions, and extensive stormwater treatment through bio-retention ponds and underground filtration systems. Metro Logistics transforms an environmentally compromised site into a tax-generating, job-creating asset that supports economic growth while contributing to a more sustainable future.



Interior Highlights:

  • 32’ clear ceiling heights for maximum storage and racking capacity

  • Wide column spacing (50’ x 50’) allowing efficient warehouse layout

  • Clean, open-span loading areas designed for high-volume operations

  • Interior loading docks with safe, streamlined circulation paths

  • Speculative office suite providing turnkey administrative and operational support



Project Delivery:

  • Remediated site through Maryland’s Voluntary Cleanup Program (VCP)

  • Secured entitlements while protecting adjacent PMA and culvert

  • Mitigated material and supply chain delays with early procurement

  • Used value engineering to maintain budget and schedule